  • For low travel areas slower charging and batteries make a lot more sense as the investment in ultra fast charging is not viable and I don’t see that changing

    I think regulatory inertia Is always going to be a problem but if we are regularly adding charging stations it will get faster as power companies have an incentive to build them and you get staff trained up on them

    Gas stations can still have single point failures for example if their underground tank gets contaminated or damaged and they don’t have a back up and electric doesn’t need to have single point failures you can run them in parallel with breakers able to isolate portions of the system and have redundant transformers

    EV works best if most people charge at home/work and people only charge in public if they don’t have the ability to do it at home or they are on a long drive. So you don’t need to meet the same cars per hour as gas stations.

    I don’t see a world where fast charging is as cheap as slower charging just due to increased losses and more expensive equipment so I believe having 10 500kw chargers would be a better investment than 6 1MW chargers even though technically the MW chargers have a larger throughput they are more expensive to produce/run and have more issues if for example 8 people arrive at once



  • It doesn’t need to be, high voltage transmission lines can run 1000s of MW then you can use a transformer to step the voltage to what you need and then use a rectifier bridge to convert to DC.

    The problem I see is the effect of trying to turn on and off 1MW power from a grid could cause problems so the battery could work a bit as an expansion tank to smooth out grid power, so that you always charge it at 100KW and if you need to increase supply you can slowly increase your power draw without shocking the grid.

    At the end of the day I personally think 1MW charging is overkill and a 10 minute charge time is a perfectly reasonable goal